Post Scan Action - Not Sticking

Discussion in 'ESET Smart Security' started by dennyp, Mar 31, 2013.

Thread Status:
Not open for further replies.
  1. dennyp

    dennyp Registered Member

    Joined:
    Mar 4, 2013
    Posts:
    8
    Location:
    Phoenix AZ
    Running ESET 6.0 on Win 7.

    I run a scan every evening. The post-scan action is set to shutdown which is does. On Friday, I sometimes want the system to take no action because I am running a backup job that may not complete before the scan completes. On those days, I use the Scheduler to modify the post-scan action to No Action and I save it. When I go back to verify the setting it indeed shows No Action. However, after the scan completed the computer shut down anyway. Even if I use the drop down selection on the running scan to change the action, it still doesn't change.

    The change only seems to stick if I change it and reboot. I haven't done this a number of times to verify it. But the problem of the change to the option not sticking is repeatable.

    Added: this option worked fine in v 5.
     
    Last edited: Mar 31, 2013
  2. Quad

    Quad Registered Member

    Joined:
    Jan 10, 2013
    Posts:
    47
    Maybe it's a bug, but it's a bit cumbersome to reproduce for me at the moment as it requires at least one shutdown.

    However, as a workaround, why don't you create two scheduled tasks; one with the post-action set to Shutdown, and the other set to 'No Action', keep the first checked during the whole week, then on Friday, uncheck the first and check the other.

    Maybe you'll even find this easier and faster than editing the single task every week and adjust the post-scan action and then re-save it.

    I hope it works for you.
     
  3. dennyp

    dennyp Registered Member

    Joined:
    Mar 4, 2013
    Posts:
    8
    Location:
    Phoenix AZ
    It may be more difficult to reproduce. I tried it on a second computer and the action seems to work. I have to do more testing on that second computer when I have time to be sure, though.

    Your idea of having 2 scan tasks is one that I will implement as a partial workaround. The only glitch to that plan is that sometimes I can't get to the computer to change which scan task is scheduled until after the scan has started. But I can try to arrange the timing so it is easier to do that.

    Thanks.
     
  4. dennyp

    dennyp Registered Member

    Joined:
    Mar 4, 2013
    Posts:
    8
    Location:
    Phoenix AZ
    As a workaround I set up the 2 tasks and used the weekly option in the scheduler to indicate which day of the week to run each one to correspond with my backup jobs that run on the weekends.

    I'll have to wait until next weekend to see if this works for me.
     
  5. Quad

    Quad Registered Member

    Joined:
    Jan 10, 2013
    Posts:
    47
    Well, that seems like a good setup, I don't know why I didn't think of the weekly option.

    You're welcome.
     
Thread Status:
Not open for further replies.
  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.