![]() |
|
#1
|
|||
|
|||
|
Looking for reassurance after seeing so many messages showing difficulties.
This is a production, line of business application server. HP DL380 G5 with Hardware Raid 5. all logical partitions within the one array, none extended. Need to resize first Partion which is used as C; system drive: currrently of 40 GB to 50 GB. Plenty of space on the next partition(E ![]() Only 1GB of unused space on C. Am I safe to proceed with confidence using Paragon Partition Manager 10 Server? I assume the routine is to resize second partition(E somehow ensuring that space is taken from the startof the partition as one operation.Then grow c: as the second operation. Any hints or corrections or other thoughts will be very appreciated as this looks very hairy from the contents of the forums. Starting to wish I had purchased the support package as well as the software assurance option......... RRE |
|
#2
|
||||
|
||||
|
Hello RRE,
This is a very typical operation. For best practices, we recommend you run a check disk on the E drive and defrag. The most time consuming part of this operating is shrinking the E drive, and depending what you have on the E drive, you can do it live or requires a restart. Expanding the C partition is almost instantaneous and can be done in Windows. If your E drive is used for storage, the volume can be unmounted in Windows and shrink live. If your E drive is used in a database manner, either the services need to be shutdown or a restart is required. When attempting to resize the partition, either the operation will go without a restart, or a warning screen will come up asking for a restart. On that screen, there's a hyperlink in the bottom left telling you which operations/processes are preventing it from being done live. Now if the E drive is completely empty, the quickest way is to delete the partition, expand C, and recreate E. Otherwise, shrink the E drive from the left side to the right, to create the free unallocated space BETWEEN the two partitions. We always recommend you break down the steps and complete one at a time. Don't stack multiple jobs in one queue. If you have any other quick questions, please feel free to contact us at : 1 888 347 5462
__________________
Paragon Software Group |Knowledge Base |Sign in Account |Update & Upgrade Center |Product Manuals |Submit a Ticket |Scripting Manual |
| « Previous Thread | Next Thread » |
| Thread Tools | Search this Thread |
|
|