LenC
July 30th, 2008, 05:19 PM
I have an incremental backup scheduled to run daily at 3:00am. If the computer is turned on, the backup runs as expected. If the computer is on standby at 3:00 (not turned off), the backup runs when I power the machine up later in the day.
I wouldn't have expected this result - I assumed (and wanted) for the backup to be permanently skipped.
(I did not check the box to run missed tasks when computer is started.)
Is that the expected result - backup runs when coming out of standby mode or am I missing another parameter in the setup?
Thanks,
Len
I wouldn't have expected this result - I assumed (and wanted) for the backup to be permanently skipped.
(I did not check the box to run missed tasks when computer is started.)
Is that the expected result - backup runs when coming out of standby mode or am I missing another parameter in the setup?
Thanks,
Len